For the site mobilization of the hotel project to be built in the Maldives, the project was designed using a prefabricated panel system. It includes dormitories, a dining hall, sports area, laundry room, office, canteen, infirmary, and social spaces. The 18 prefabricated buildings were produced and ready for shipment in one month.