The İstanbul Finance Center mobilization project, constructed with a prefabricated panel system, includes a two-storey 546 m² prefabricated office building and a three-storey 1,587 m² prefabricated dormitory building. The production, transportation, and assembly of the buildings were successfully completed within a span of 1.5 months.