Balıkesir Mining Camp Project

Technology
Prefabricated Panel
Location
Balıkesir
Size
50,000 m²
Delivery Time
4 months

Project Detail

Eight of the office, dormitory, and workshop buildings for the mine were constructed using a prefabricated panel system, and two were built with a lightweight steel building system.

Gallery

Our web site is being renewed
vekon@vekon.com.tr
notre site web est en cours de renouvellement
vekon@vekon.com.tr
Contact Form +90 216 390 47 77 Go to Top